Construction is one of the largest consumers of raw materials and one of the largest producers of waste, and the pressure to build more responsibly keeps growing. A material efficiency assessment is the structured response: it looks at how a project uses materials from design to end of life and finds where waste, environmental impact and resource use can be cut. BREEAM Mat 06 is the credit that rewards doing this properly, with waste minimised, resource value kept and circular economy principles built in from the earliest stages of design.
What material efficiency means
Material efficiency is making the best possible use of materials over a project's whole life, so that less is wasted, less environmental harm is done and fewer resources are consumed. It runs from extraction and manufacture through installation and use to end of life, and it rests on four principles.
Waste is designed out at every stage. That starts with design dimensions that reduce cutting waste and carries through to how materials are managed and recycled on site. Materials are chosen to be durable, fit for purpose and high-performing for the resource they consume, so that less material does the same job for longer. Recycled and reused materials are preferred over new, and the building is designed so that its components can be taken apart and recovered when it is altered or demolished. And low-carbon materials are specified, to limit the greenhouse gas emissions of producing and delivering them.
Followed through, these principles reduce environmental impact and cost together, and they make the project less exposed to shortages of the materials it depends on.
What BREEAM Mat 06 asks for
BREEAM (Building Research Establishment Environmental Assessment Method) is a leading sustainability assessment method for buildings and infrastructure, used around the world. Mat 06 Material efficiency is the credit within it that rewards projects for deliberate steps to use resources well and limit the environmental impact of their materials. To achieve it, the project has to show a planned approach with six elements.
The first is a material efficiency strategy: objectives, targets and performance indicators set at concept stage and carried through to completion. The second is design, which does most of the work. Standardised and modular dimensions reduce cutting waste and make the building simpler to take apart later; a structure designed to use less material for the same performance saves material before anything is built; and design for disassembly (DfD) means components can be reused or recycled at end of life. The third is a waste management plan that puts prevention first, then reuse, then recycling, with measurable targets for reduction. The fourth is material selection: high recycled content, local sourcing and lower embodied carbon. The fifth is how materials are handled on site, with segregation and logistics organised to limit waste and damage. The sixth is monitoring and reporting, with material flows tracked against the targets so that the project can show continual improvement.
The credit asks for more than a waste plan. It rewards a proactive, data-led approach to resources, in which the team designs waste out of the construction process and thinks in circular terms from the outset. The same principles apply to a refurbishment or retrofit, where they improve the resource efficiency of an existing building.
What the assessment is worth
Embedding material efficiency from design to delivery cuts waste, lowers embodied carbon and uses resources more intelligently. It is sound commercially as well as environmentally: costs fall, performance improves and the asset lasts longer. The time to start is concept stage, because the targets, the dimensions and the structural design that earn the credit are all set there.