BREEAM V7 retains the Man 05 Post-Occupancy Evaluation credit with no changes to criteria.

No metric can measure the performance of a building better than the review of its occupants – the people who use its services and assets. A post-occupancy evaluation provides actionable data on the performance of a building. This consequently provides valuable insight into how buildings function in various environments, and the occupancy-related factors that impact their performance.

A post-occupancy evaluation is a structured study that gathers comprehensive in-use performance feedback. This in turn can be used to identify gaps between design intent and in-use performance. This data is used for continual improvement in building design methodologies, and to optimise the performance of a built asset. Poor building performance can impact on carbon footprint, running costs, occupant health and wellbeing, and business efficiency.

A Post-Occupancy Evaluation is a long-term (typically, 1 year) commitment where the building’s occupants are surveyed about their perceptions on the building’s performance. ADW Developments has a substantial experience in conducting detailed post-occupancy evaluations based on a dedicated, evidence-based survey approach.

What we measure

The occupant survey is the core of it: thermal comfort, air quality, lighting, acoustics, and whether the spaces work for what people actually do in them. Where the scope allows, we set those answers against physical readings taken at the same time, such as temperature, humidity, CO₂, light and noise levels, so a complaint about stuffy meeting rooms can be checked rather than taken on trust.

Alongside that, we compare metered energy and water use with the design targets, walk the building to see how the spaces are being used, and go through the maintenance logs for faults that keep coming back. Interviews with the facilities team usually explain what the numbers cannot.

The report sets out where the building falls short of what was designed, why, and what the operator can change now, from plant schedules and lighting controls to maintenance routines. The same findings go back to the design team for the next scheme.