A whole life carbon assessment counts the carbon a building is responsible for across its entire life: the materials it is made from, the energy used to build it, the energy and replacements it consumes while in use, and what happens to it at the end. It is the number planning officers, BREEAM assessors and funders increasingly ask for, and the one most likely to change a design decision if it arrives early enough.
Who needs one, and when
Three things usually trigger an assessment, and they do not always arrive together.
- London Plan Policy SI 2. Referable applications to the Greater London Authority must submit a whole life-cycle carbon assessment on the GLA's own template, at planning and again after construction.
- BREEAM Mat 01. The life cycle assessment credit rewards an assessment carried out early enough to influence the design, and penalises one produced to document a decision already made.
- Investor and lender reporting. Embodied carbon is now a standing question in due diligence, and the answer is expected to be calculated rather than estimated.
The timing matters more than the trigger. The decisions that move whole life carbon most (structural frame, substructure, façade build-up, whether you refurbish or rebuild) are made at RIBA Stages 1 and 2. An assessment commissioned at Stage 4 will produce a compliant number and almost no opportunity to improve it.
What we deliver
- A whole life carbon model covering modules A1–A5, B1–B7 and C1–C4, with module D reported separately as the standards require.
- The GLA whole life-cycle carbon assessment template, completed, where Policy SI 2 applies.
- A reduction roadmap: the options we tested, what each one saves and what it costs.
- The evidence pack a BREEAM assessor needs for Mat 01, in the form they expect it.
- A post-construction update reconciling the as-built position against the design-stage assessment.
Method and standards
We calculate to BS EN 15978, the European standard that defines the modular structure every credible assessment uses, and report to the RICS Whole Life Carbon Assessment for the Built Environment, 2nd edition, which sets the UK rules on scope, data quality and how results are presented. Where the scheme is referable, results are transferred to the GLA template so the planning officer sees the format they are expecting.
Product data comes from EPDs wherever a specification is firm enough to support one, and from recognised generic datasets where it is not. We say which is which. An assessment built on generic data is perfectly legitimate at Stage 2; presenting it as though it were product-specific is not.
The same model feeds BREEAM Mat 01. Running the planning assessment and the BREEAM assessment as one exercise avoids paying twice for the same calculation and avoids the awkwardness of two numbers for one building.
Deliverables by RIBA stage
- Stage 1: Preparation and brief. A baseline and a carbon budget, plus the refurbish-or-rebuild comparison while it is still a real choice.
- Stage 2: Concept design. The first full assessment, with options appraised across frame, substructure and envelope. This is the stage where the assessment earns its fee.
- Stage 3: Spatial coordination. The assessment updated against the developing design, and the GLA template populated for the planning submission.
- Stage 4: Technical design. Generic data replaced with EPDs as the specification firms up, and the BREEAM Mat 01 evidence pack assembled.
- Stage 5: Construction. Procurement tracked against the assessment, so substitutions are caught while there is still time to question them.
- Stage 6: Handover. The post-construction assessment, including the GLA's post-completion reporting obligation.
Programme
Turnaround depends on three things: the stage you are at, how complete the model and specification are, and whether a pre-demolition audit is needed first on a site with existing structures. A Stage 2 options appraisal on a reasonably well-developed concept is a short exercise; a Stage 4 assessment reconciling hundreds of EPDs is not. We give a programme in working days with the fee proposal, once we have seen the drawings.
Fee basis
Fees are set against floor area, building type, the number of design options to be tested, and whether the scope includes the GLA template, BREEAM Mat 01 evidence, or both. We quote a fixed fee for a defined scope rather than a day rate, so the cost does not move if the model turns out to be more work than expected.
Two projects
- Tower Bridge Court, London SE1: carbon accounting on a 14,168 m² refurbishment and extension beside Tower Bridge. The assessment put the saving from refurbishing rather than rebuilding at 6,383 tCO2e, which is the kind of figure that settles an argument at planning.
- City of Dreams Mediterranean, Limassol: life cycle assessment delivered alongside life cycle costing, climate change adaptation and material efficiency on Cyprus's first integrated resort, which reached BREEAM Excellent at 80.4%, the first development in the country to do so.
Common questions
Is a whole life carbon assessment the same as an embodied carbon assessment?
No. Embodied carbon covers the materials and construction (broadly modules A, B1–B5 and C). Whole life carbon adds the operational energy and water in B6 and B7. A planning authority asking for whole life carbon will not accept an embodied-only figure.
We are not in London. Does Policy SI 2 still matter?
Not directly, but the direction of travel does. Authorities outside London increasingly ask for the same evidence, and the RICS standard applies wherever you build. An assessment produced to the London format will satisfy most requests elsewhere.
Can you assess a refurbishment?
Yes, and it is usually where the strongest result sits. Retaining a structure avoids the single largest block of embodied carbon in most buildings, and quantifying that avoided carbon is often what justifies the refurbishment commercially as well as environmentally.
What do you need from us to start?
Drawings or a model, an outline specification, the target rating or policy you are working to, and the RIBA stage. If the specification is not fixed, we start on generic data and refine it. Waiting for certainty is how projects miss the stage where the assessment is useful.
Why do two assessments of the same building disagree?
Usually scope and data: a different study period, different modules included, or generic data on one side and EPDs on the other. We state all three up front, which is also what makes an assessment defensible when someone challenges it.